This project is occuring at the City's wastewater treatment plant. The construction and buildings are located at 109 Fitzgerald Park Drive.

PROJECT HISTORY & SUMMARY

Expansions and improvements to the WWTP, as mandated by the State of Michigan, are also needed. This project has an anticipated cost of $52.4 million. Our current WWTP capacity and ability is not sufficient to meet state requirements or our community's growth. When the WWTP reaches limitations, raw sewage is disposed into our waterways. This happens in every community exceeding WWTP capacity and is a violation of State of Michigan regulations.

  • Rate increases to support WWTP improvements will be reflected on bills this year and in future years.
  1. 1 20260213_Sludge_Buffer_Tank_Walkways
  2. 2 20260220_Site_Overview
  3. 3 20260220_AGS_Tank_Base_Slab_Resteel
  4. 4 20251230_Vortex_Well_wall_resteel_progress (JPG)
  5. 5 20251230_AGS_Buffer_Tank_wall_resteel_progress (JPG)
  6. 6 20260115_Cleared_Concrete_Pad (JPG)
  7. 7 20251216_Vortex_Str_base_slab_progress (JPG)
  8. 8 20251216_PEEW_Pipe_modification_at_RW_Pipe (JPG)
  9. 9 20251212_RW_Pipe_into_Valve_Vault (JPG)
  10. 10 20251212_AGS_Buffer_TAnk_wall_resteel_progress (JPG)
  11. 11 20251121_AGS_Tank_Excav_Progress (2)
  12. 12 20251121_SPB_backfill_slab_trough
  13. 13 202251120_Jack-bore_under_RW_trough (2)
  14. 14 20251113_Valve_Vault_wall_panels
  15. 15 20251105_Excavate_New_AGS_Tank (jpg)
  16. 16 20251104_New_Sludge_Bldg_Ret_wall_panels (jpg)
  17. 17 20251021_New_Ters_Bldg_tangent_pile_progress
  18. 18 20250918_Excav_Test_Pit_Sludge_Bldg (2)
  19. 19 20251009_New_Sludge_Bldg_subbabse_Mudmat_install (1)
  20. 20 20251014_Install_diagonal_rock_anchors_W_TERS_AGS_Str
  21. 21 20250729_Excavate_at_Intermediate_PS_expose_pipe (2)
  22. 22 20250902_Install_new_THS-RD_Pipe_at_MH-B (1)
  23. 23 20250918_Excav_Test_Pit_Sludge_Bldg (2)
  24. 24 20250918_Tangent_Pile_Progress_at_Sludge_Bldg (1)
  1. 2025

All trails at Fitzgerald Park and the walking path to the dam/Grand River have been reopened. The drive to access the dam/Grand River with a vehicle remains closed at this time.

  • January 
    • In January, MacKenzie continued extending the pipes south of the existing Retention Basin. RK Davis continued work erecting forms and resteel for the AGS Buffer Tank, pouring concrete walls for the Vortex Grit Removal Structure, and pouring a second mud mat for the AGS Tanks. Bee Steel continued to set the resteel for the westernmost AGS tank base slab. FHC Mechanical continued work on the Alum System and installed pipes for the AGS Sumps.
  • February
    • In February, MacKenzie prepared the final AGS Tank mud mat area on the east end of the site, Bee Steel continues the installation resteel for the second AGS Tank base slab, FHC Mechanical reinstalled equipment in the Blower Building, installing a pipe sleeve for the next sump pit in the AGS Tanks, RK Davis supervised on site work, continue installing resteel and forms for the AGS Tank base slabs and for the Vortex Structure, installed forms for the lid of the RWLS Valve Vault, and began work in the Headworks Building.